Bids requested

Subcontractors and Suppliers

Capitol Paving is currently soliciting qualified suppliers and subcontractors to submit quotes for the solicitations listed below.

Suppliers

Quotations can be sent by e-mail to bids@capitolpaving.com or by fax at (202) 832-4642.

Subcontractors

Please fill out the subcontractor questionnaire to the right before applying for any of the opportunities below.

Subcontractor Opportunities

Reconstruction of the Anacostia Ave Bridge 78

Solicitation Number:  DCKA-2026-B-0027              Owner: District Department of Transportation (DDOT)    Bid Opening:  February 27, 2026

Summary

The District of Columbia Office of Contracting and Procurement (“OCP”), on behalf of

the District Department of Transportation (“DDOT” or “Department”), is seeking a

contractor to provide Reconstruction of the Anacostia Avenue Bridge over Anacostia

River Outlet (Bridge 78) in accordance with the Contract Documents, as defined herein.

 

To review plans and specifications, copy and paste link to your browser

Link:     

https://capitolpaving-my.sharepoint.com/:f:/p/luis_bramao/IgD4siZN-Ln5QLMGCkFsQb97AbgFE8USSIesAhBE2sx5IMo?e=yM6a7b

 

 

Lead Service Line Replacement Contract: Construction Package 22

Solicitation Number:  DCW-SOL-26-10509  230030.15
Owner: District of Columbia Water and Sewer Authority
Bid Opening:  January 30, 2026

 

Summary
  1. Install new copper service tubing, corporation stop (if required), curb stops and

boxes, water meter boxes and frames, ball valves, service saddles and fittings to

remove existing and reinstate water service to the customer through trenchless

methods. Work may include core drilling and necessary adapters and fittings

necessary required to reinstate water service to the customer.

  1. Disposal of existing domestic lead service lines including removed corporation

stops, curb stops and boxes, lead service tubing, valves, adaptors, excess soil,

concrete, asphalt, vegetation and contaminated material and old water meters if

directed by DC Water in accordance with all local and Federal restrictions.

  1. Providing necessary traffic control to meet DDOT requirements to allow work

within the public right of way.

  1. Excavation, backfill and compaction including District required erosion and

sediment control as well as tree protection.

  1. Coordinating with DC Water.
  2. The DC Water will obtain most of the required right-of-entries and will provide

preliminary block scheduling to the Contractor based on number of entries

obtained. Right-of-Entries, obtained traffic control permits and schedules will be

provided to the contractor post bid. For any address on a block where the DC

Water has not obtained Right-Of-Entry forms, the addresses will be assigned to the

contractor to obtain the Right-Of-Entry prior to scheduling the block for

replacement.

  1. The Contractor shall provide detailed block schedule and be responsible for

coordination and scheduling work on an overall program and individual block

basis. The DC Water reserves the right to expediate, delay or remove blocks due

to ongoing coordination of work throughout the City at no additional cost to DC

Water. Work will also include promotion of the replacement program through the

targeted use of door hangers, flyers, matrix message boards, yard signs, etc in the

work area.

  1. Pavement and concrete removal, including saw cutting as required.
  2. Temporary water service if the customer is without water for more than 8 hours

over the course of any 24 hour period.

  1. Interior restoration (as-needed).
  2. Broom clean all interior rooms, sidewalks, walkways and other areas used by the

Contractor to access the work.

  1. Installation of temporary pavement and sidewalk and maintaining it until

permanent is installed.

  1. Where historic pavement (e.g., cobblestone, Belgian block, blue stone slate, etc.)

is encountered, Contractor shall carefully remove, salvage, and reinstall in

accordance with State Historic Preservation Office (SHPO) guidance and DC

Water direction.

  1. Contractor shall restore all areas disturbed by construction to conditions equal to

or better than pre-construction conditions. For water service line replacements,

exterior restoration shall occur within 20 business days, and interior restoration

within 2 business days. For Access not Granted, all temporary and permanent

interior and exterior restoration shall occur within 2 business days.

  1. Dewatering and excavation support and protection.
  2. Trenchless installation, leakage testing and flushing of new service lines and

connecting to existing water meters.

  1. Photographic documentation pre- and post-construction activities input into GIS

database.

  1. Installing of new service taps into the water main
  2. Compilation of as-built information for the completion of service tap cards to be

entered into DC Water’s 3PP system.

  1. All other work, including but not limited to submittals; providing temporary

facilities; all specified special provisions; environmental protection; erosion and

sedimentation control; site preparation; rock excavation; removal of concrete road

base, trenching; decking; furnishing and installing repair clamps; furnishing and

installing granular fill materials; pipeline cleaning, and flushing; dust control; 
final/permenant pavement, curb and sidewalk repair and resurfacing; landscaping;
loaming and seeding; sodding which shall be used only at the direction of DC
Water and shall be per DDOT requirements, surface restoration; miscellaneous
work and cleanup; and all else incidentals required for successful completion of
the work as specified. 

 To review plans and specifications, copy and paste link to your browser

Link:     

https://capitolpaving-my.sharepoint.com/:f:/p/luis_bramao/IgArIAvGCnSGQZiPCGP5zyIhATGtrm2IThEZMpQRjp2Uu8Q?e=0uLOrf

Drainage and Stormwater Improvement Construction

Solicitation Number:  DCKA-2025-B-0112
Owner:  District Department of Transportation (DDOT) 
Bid Opening:  March 4, 2026

 

Summary

The purpose of this project is to conduct the installation, rehabilitation, and repair of drainage

and stormwater management facilities in the District. Work may include improving the hydraulic

capacity and structural integrity of the culverts, inlets, catch basins, open channels, stormwater

management facilities, and any other drainage asset.

 Link: 

https://capitolpaving-my.sharepoint.com/:f:/p/jose_cambronero/IgAPuzSTd6hvQJE-bLkDgPL8AVj38u0M6He2EBdozGv_rcE?e=lfakDk

Copy and Paste the Link Below in Browser for Plans and Specifications

https://capitolpaving-my.sharepoint.com/:f:/p/luis_bramao/Eli1GqKR29hNifjUKSrMqSUBeEHp01HJvBGwYAkO24lfYQ?e=IKR4Gp

230030.16 Lead Service Line Replacement Contract: Construction Package 23

Solicitation Number:  DCW-SOL-26-10513
Owner: District of Columbia Water and Sewer Authority
Bid Opening:  February 25, 2026                                                                                                      

 

Summary

Site work for a water/sewer project in Washington, DC

 LINK:

https://shared.outlook.inky.com/link?domain=capitolpaving-my.sharepoint.com&t=h.eJxlzltLwzAYxvGvMnJtkybrcigMnVh0MmFD2e3IqW3WtSnpAZz43bUy0OH18_L-fx9gCCeQzkDZ922XIqRl63p_auXomiKq32FXymBb75oeal-jNE9Ri46-swctaxV8Y4NH62K1Hc6vb4aW4-45i9Smeii2G77aH-d8iF_okyXZvfHnx_EQdHZrl2ytqiYDNzNQTflLNrp0jUY2OF1BXTotu7sr1Y8jF2ahEsoF1okSi5wQzInAyVwmglvBEGYMxzEjDEMhKKWCTzE7xSY9_NX__z5dmj-s68V9L_jzC-0-ZeA.MEUCIQCfInTT83XUIf5ySst-yEvMblDPDJoT0vuqieU9rxhylQIgGoTDSC-iz5seyyP5O24BWwqp6fpHTkhoERb7E_wUcG0

Copy and Paste the Link Below in Browser for Plans and Specifications

 

North Marlton Ave Water Main Replacement

Solicitation: BTCR 6481A18 (Reposted)
Bid Opening: December 18, 2020

Small Diameter Water Main Replacement 13A

Solicitation: 160021
Bid Type: OPEN
Bid Opening: November 13, 2019
Subcontractor Requirement: MBE 32% WBE 6%

Job Description
The Contractor shall provide all labor, materials and equipment for the construction of the Project in accordance with the Contract Documents (“the Work”), which includes approximately half mile of roadway construction, part reconstruction and part mill and overlay; sidewalk widening and reconstruction.

Capitol Paving is an Equal Opportunity Employer

All Subcontractors must adhere to
Equal Opportunity Clauses,
Subsection 1103.2 through 1103.10 in order to be considered